Construction Guidelines

The NC State University Construction Guidelines is presented to the design community as an aid to the design and construction of facilities and renovations at NC State University. The information collected here represents the efforts of many design, construction, operations, and safety professionals to provide uniform and relevant information to designers on minimum standards required for University work.

This edition of the Guidelines represents a significant modification of the 1998 edition. It is intended to be a companion document to the Physical Master Plan - A Campus of Neighborhoods and Paths, and to supplement the policies and procedures of the State Construction Office and the latest edition of the State Construction Manual. All professionals providing design and construction administration services to the University should be familiar with the State Construction Manual and have copies for reference.


Construction Guidelines

Introduction

   

0

Planning and Design Issues

General Issues
Environmental Health & Safety
Space Planning and Standards
Classroom Standards
Building Services
Room Numbering & Wayfinding
CADD Standards
Building Security

00700
00701
00702
00703
00705
00710
00711
00712

01-04-2006
06-15-2001
01-31-2006
03-01-2004
01-31-2006
06-15-2001
06-15-2001
09-26-2003

1

General Requirements

Supplemental General Conditions
   Single Prime
   CM At Risk
   UNC-OP
Contractor Safety Notifications
Temporary Facilities
Decommissioning/Decontamination

01301



01302
01500
01900

04-18-2005
12-04-2003
02-23-2004
06-16-2004
09-30-2004
01-04-2006
07-26-2004

2

Sitework

Site Utilities
Site Amenities
Landscaping
   Accessible Curb Cut Drawing
   Brick Sidewalk Drawing
   Tree Planting Drawing
   Wood Bench Drawing

02500
02800
02900

02-01-2003
01-27-2006
02-14-2005
06-08-2004
06-08-2004
06-08-2004
06-08-2004

7

Thermal and Moisture Protection

Thermal and Moisture Protection

07000

01-04-2006

8

Doors and Windows

Doors
Windows
Finish Hardware

08100
08500
08700

01-04-2006
01-04-2006
01-04-2006

9

Finishes

Interior Finishes

09000

01-04-2006

10

Specialties

Interior and Exterior Signage

10400

07-17-2007

11

Equipment

Laboratory Equipment

11600

06-15-2001

12

Furnishings

Window Treatments

12400

06-15-2001

13

Special Construction

Access Control and Detection (draft)
Hazardous Gas Handling & Detection

13700
13852

03-15-2005
06-15-2001

14

Conveying Systems

Elevators

14200

02-01-2003

15

Mechanical

Basic Mechanical Requirements
Motors
Mechanical Identification
Mechanical Insulation
Pumps
Water Treatment
Fire Protection
Plumbing
Central Chilled Water
Cooling Towers
Air Handling Units
HVAC Instrumentation and Controls

15000
15055
15075
15080
15130
15189
15300
15400
15535
15640
15720
15900

01-11-2005
01-11-2005
02-01-2003
03-24-2005
07-26-2004
07-26-2004
04-22-2005
02-14-2005
06-15-2001
09-30-2004
07-17-2007
06-15-2001

16

Electrical

Electrical Power
Transmission and Distribution
Lighting
Fire Alarm Systems

16200
16300
16500
16900

06-15-2001
06-15-2001
01-27-2006
06-04-2003

17

Telecomunications

System / Project Overview

17000

07-17-2007