Facilities Services

Construction Guidelines

The Construction Guidelines are in the process of being revised and organized under the new numbering system as show on this page. If you don't see the particular guideline you are looking for you may find an earlier version here.

The NC State University Construction Guidelines is presented to the design community as an aid to the design and construction of facilities and renovations at NC State University. The information collected here represents the efforts of many design, construction, operations, and safety professionals to provide uniform and relevant information to designers on minimum standards required for University work.

This edition of the Guidelines represents a significant modification of the 1998 edition. It is intended to be a companion document to the Physical Master Plan - A Campus of Neighborhoods and Paths, and to supplement the policies and procedures of the State Construction Office and the latest edition of the State Construction Manual. All professionals providing design and construction administration services to the University should be familiar with the State Construction Manual and have copies for reference.

PLANNING AND DESIGN

   

Planning and Design - Security
Planning and Design - General Issues
Planning and Design - Classrooms

00
00
00

06-21-2011
05-25-2011
08-17-2011

     

General Requirements

   

General Requirements for Construction Phase

Supplemental General Conditions

01

 

05-25-2011

05-25-2011

     

Facility Construction

   

Existing Conditions
(Concrete)
(Masonry)
(Metals)
(Wood, Plastic, and Composites)
(Thermal and Moisture Protection)
Openings
(Finishes)
Specialties
(Equipment)
Furnishings
Special Construction
(Conveying Equipment)

02
03
04
05
06
07
08
09
10
11
12
13
14

05-25-2011





05-025-2011

05-25-2011

05-25-2011
05-25-2011

     


Facility Services

 

 

(Fire Suppression)
(Plumbing)
(Heating Ventilating and Air Conditioning)
Hydronic Pumps
Laboratory and Industrial Ventilation Systems
Mechanical Insulation
(Integrated Automation)
(Electrical)
(Communications)
(Electronic Safety and Security)

21
22
23

 

 

 

25
26
27
28




11-02-2011
11-02-2011
11-02-2011




     


Site and Infrastructure

 

 

(Earthwork)
(Exterior Improvements)
(Utilities)
(Transportation)
(Waterway and Marine Construction)

31
32
33
34
35





     


Process Equipment

 

 

(Process Integration)
(Material Processing and Handling Equipment)
(Process Heating, Cooling, and Drying Equipment)
(Process Gas and Liquid Handling, Purification, and Storage)
(Pollution Control Equipment)
(Industry-Specific Manufacturing)
(Electrical Power Generation)

40
41
42
43
44
45
48







 

 

 


Facilities Services