|
![]() |
|
Custom Search
Postal Address: Shipping Address: |
Agenda for Spring 2008 Erosion and Sedimentation Control Planning and Design WorkshopsMarch 11-12, 2008 April 9-10, 2008 Workshop is full. No longer accepting registrations. Purpose: These workshops are structured to educate and familiarize design professionals on the NC Sedimentation Pollution Control Act (SPCA), the rules implementing the Act, and design standards for erosion and sedimentation control best management practices (BMPs). Credits: 12 PDHs will be available to professional engineers and land surveyors, and 10 continuing education hours for landscape architects upon completion of one of these workshops. Please provide your license number on registration form.
Agenda for March 11-12, 2008, Wilmington, NC Tuesday, March 11 8:00 – 8:30 am Registration 8:30 – 8:45 am Opening Remarks 8:45 – 9:15 am Land Quality Update: Self Inspection Rule 9:15 – 9:30 am Manual and Web Update 9:30 – 10:00 am When a Construction Site Becomes a Mine 10:00 – 10:30 am Break and Exhibits 10:30 – 11:00 am Installing and Maintaining Skimmers and Basins 11:00 – 11:30 am NPDES Stormwater Permit Self Inspection 11:30 – 12:00 pm Field Tour Introduction 12:00 – 1:00 pm Lunch (provided) 1:00 – 5:00 pm Field Tour Wednesday, March 12, 2008 8:30 – 9:30 am Subdivision Erosion Control Plan Requirements 9:30- 9:50 am When a Plan is Required for Lot Construction 9:50-10:20 am Break and Exhibits 10:20 – 10:50 am Mulching Options: Pay Now, or Pay Later 10:50 – 12:00 pm Ground Cover 12:00 – 1:00 pm Lunch (provided) 1:00 – 1:30 pm Field Tour Discussion 1:30-2:15 pm Erosion Control Plan for Utility Construction 2:15 – 3:00 pm Innovations in New Check Dams 3:00 pm Adjourn Agenda for April 9-10, 2008, Hickory, NC Wednesday, April 9, 2008 8:00 – 8:30 am Registration 8:30– 9:00 am Land Quality Update: Self Inspection Rule 9:00– 10:10 am Ground Cover 10:10– 10:40 am Break and Exhibits 10:40 – 11:10 am Installing and Maintaining Skimmers and Basins 11:10 – 11:40 am NPDES Stormwater Permit Self Inspection 11:40 – 12:00 pm Field Tour Introduction 12:00 – 1:00 pm Lunch (provided) 1:00 – 5:00 pm Field Tour Thursday, April 10, 2008 8:30 – 8:45 am Opening Remarks 8:45 – 9:45 am Subdivision Erosion Control Plan Requirements 9:45- 10:10 am When a Plan is Required for Lot Construction 10:10-10:40 am Break and Exhibits 10:40– 11:10 am Mulching Options: Pay Now, or Pay Later 11:10 – 11:25 am Manual and Web Update 11:25– 12:00 pm When a Construction Site Becomes a Mine 12:00 – 1:00 pm Lunch (provided) 1:00 – 1:30 pm Field Tour Discussion 1:30-2:15 pm Erosion Control Plan for Utility Construction 2:15 – 3:00 pm Innovations in New Check Dams 3:00 pm Adjourn |